Hambro Roofing Limited specialise in roofing and was originally established in 1978 by Steve Hammersley. We have been trading for 40 years and is currently managed by Jon, David & Steve Hammersley. We work on new build and refurbishment projects for main contractors, facilities managers, managing agents, local authorities and schools direct with the client where we can take on the role of principle contractor with works ranging from 5k up to 2m in value.
Services
This was and existing commercial building being extended and converted into residential apartments with a play area at the ground level.
Works had to be done at speed in various stages to enable the main contractor to get their brickwork up and scaffold stuck, we worked alongside the main contrac- tor to ensure that works were carried out in accordance with their plans in a safe manner.
IcoPal's Intelligent Membrane Association (IMA) Parabit is a hot melt applied, reinforced self healing waterproofing membrane specially developed for use in inverted, green and plaza deck roofing systems.
Hambro Roofing installed and Icopal high performance felt waterproofing system with a rubber playground finish and artificial grass.
The impact absorbing surface is designed to offer maximum safety performance with durability and cost effectiveness.
The surface consists of two layers: a base layer of coarse black granules made from recycled tyre rubber, and a coloured top layer of much finer rubber granules.
The school had major works including refurbishment of the existing roofs and an extension being built requiring a further 2,000m2 of waterproofing to the new roofs.
At times the school was in attendance, we worked alongside the main contractor and the school to ensure that works were carried out in accordance with their plans in a safe manner.
IcoPal's Intelligent Membrane Association (IMA) reinforced bituminous 'Profiles' membrane was chosen to overlay the existing mastic asphalt roof covering because of it's high quality and proven track record whilst minimising disruption to the school below.
The roofs had been subjected to various repairs over the years and needed serious attention.
We were originally awarded the contract for the junior school to overlay the roofs with a Radmat Esha felt system including insulating the roof, replacement of the roof lights, fascia and ship lapped timbers.
We managed to complete the works ahead of programme and were subsequently given the contract to remain onsite and replace the flat roofs on the infant school to the same specification.
SBS modified Reinforced Bitumen Membranes for use as partially bonded, fully bonded or mechanically fixed roof waterproofing on zero falls, flat or pitched roofs.
The client was extending the existing block of flats and building an additional block with underground car parking.
We installed Sarnafil single ply membrane to the main and rotunda roofs of block A (above), installed Axter Wilotekt hot melt system to the balconies of both blocks and on the podium slab above the underground car park and Axter reinforced bituminous felt system complete with solar panels to the main roof of block B (left).
Sarnafil is the industry standard single ply system with a lifespan of 40 years backed by a BBA certificate and carries insurance backed guarantees of up to 20 years.